设为首页 加入收藏
热线电话: 13933292282
联系我们
河北保定红义房顶防水工程公司
手机:13933292282 王经理
13131211999麻经理
网址:www.jianzhuqicai.com
地址:保定市七一中路翠园街
专业:防水材料、承揽防水工程
卫浴间防水施工流程
[来源:来自网络] [作者:不详] [日期:22-07-19] [浏览次数:]

卫浴间防水施工流程 Waterproof construction process between bathroom and bathroom 1、基层处理一般先仔细清扫基面去除浮尘,并去除水泥结块和松动基层;对管根、排水孔、阴阳角、墙面水电改后留下的空洞等部位进行特殊处理,阴阳角处应抹成圆弧形(或V字型)。 1, grass-roots treatment generally first carefully clean the base surface to remove the dust, and remove cement caking and loosening of the base; for pipe root, drainage hole, yin and yang angle, wall surface after the change of the hole left by the hole and other parts of the special treatment, yin and Yang corner should be made into a circular arc (or V type). 2、按比例调配:施工前需要了解如何调配防水涂料,了解调配的比例是多少等知识。如果不按比例调配,调配出来的防水涂料可能就达不到原有效果。 2, proportionate allocation: before construction, we need to know how to mix waterproof coatings and understand the proportion of distribution. If it is not proportionately allocated, the waterproof coating may not be able to achieve the original effect. 3、涂刷方法防水涂聚氨酯软管 PVC软管 隔离墩模具 u型槽模具 护坡模具 pvc输送带 尼龙输送带 天津除甲醛 北京除甲醛 料涂刷时由下至上,先墙后地涂刷。第一遍和第二遍涂刷间隔时间最好在4-8小时左右。涂刷后一遍都是在涂刷好的前一遍防水层不粘手的前提下涂刷,且前后两次的涂刷呈十字交叉。 3. The method of brushing the waterproofing coating is from bottom to top, after the wall is painted. The best time to brush between the first and second times is about 4-8 hours. After painting, it is painted on the premise that the waterproof layer is not sticky before painting, and the brush is crossed two times before and after. 4、卫浴间重点防水部位 4, the key waterproofing parts between the bathroom 地漏部位、小水管和楼板衔接部位以及马桶管道等部位,往往是卫生间最容易漏水的地方。在施工的时候,需要重点处理这些部位,一般其他部位刷两次,这里需要刷多次;此外,渗漏比较多的出现在过门石下面。施工时,在过门石下面一定要事先做一个地带,防水一定要卷到地带之上,这样才能形成一个盆状,形成蓄水、挡水的功能。 The location of floor drain, small water pipe and floor connection and toilet pipe are often the places where toilets leak most easily. In the construction, the need to focus on these parts, the general other parts of the brush two times, the need to brush many times here, in addition, the leakage of a lot of the appearance of the stone under the door. During the construction, there must be a zone in advance, and the water must be rolled over the belt. In this way, a basin can be formed and the water storage and water retaining function can be formed.

保定网站建设:保定遨游公司 版权所有 @ 河北保定红义房顶防水工程公司
总公司地址:保定市七一中路翠园街 服务电话:13131211999
友链:保定婚庆 群吊电动葫芦 加油站液位仪 焊油罐电动葫芦 保定装修装饰 保定月嫂 隔离墩模具 抹灰机
农业硫酸铜 保定装修 保定搬家 瓦楞原纸 电缆挂钩 苗木花卉 蠕动泵 保定养老院 保定搬家 保定网站制作

保定网站建设及优化保定遨游网络公司